OUR PROJECTS

Completion of installation and commissioning of number of 9 Alcatel’s  BTS stations for Al- Madar project for the expansion of Al-Madar Al-Jadid network in Phase 5 of the Eastern of Libya ( Benghazi area) which includes the installation of towers and tower foundation civil work. Many of Al Madar BTS stations have been maintained in the eastern regions of Libya.

Supply and installation of communication towers at different heights to connect a wireless system that is an alternative to the fiber optic system to connect the banking systems between the CBL Central Bank of Libya and the number of eight commercial banks in Benghazi and its environs

Completion of installation and commissioning of fire detection, alarm system in Benghazi   Ozo   Hotel   including   training   course   for   system   operation   and maintenance.

Completion of installation and commissioning of gaseous fire suppression system using FM200 gas in 2 control rooms and telecommunication equipment room for the General Electricity Company of Libya (GECOL) located in Sirt City, all FM200 materials provided from GIELLE Company( Italian Fire Protection Company).

Completion of installation and commissioning of fire detection, alarm system in Stock Exchange Building at Benghazi.

Implementation of Fiber Optic system SDH (STM-16), Commissioned by the Huawei company   to   connect   Libyana   mobile   system   and   Almadar   mobile   system headquarters  Buatunai  with  Fwyhat  post  company  building,  have  also  been participating in the commissioning and handover activities.

Supply and implementation of Surveillance system including (48) CCTV surveillance cameras in Wahda Bank headquarter to cover events in the headquarter throughout the twenty-four hours.

Installation of Time Attendance System (TAS) with the issuance of smart cards and fingerprint to identify users at the Brown & Root company headquarters Benghazi and Tripoli

Repair  and  splicing  of  the  damaged  Fiber  optic  cable  located  in  Grand  Omar Mukhtar Reservoir ( Benghazi area ), commissioned by the ABB Company

Laying and commissioning of 5 km of Fiber Optic Cable from Man-Made River Authority Headquarter to General Post company Headquarter

Implementation of the telephone network and computer network for the city’s sports media complex in Benghazi.

Supply  and  implementation  of  Surveillance  system  including  (32  )  IP  CCTV surveillance cameras in AGOCO (Arabian Gulf Oil Company) Headquarter to cover events throughout the twenty-four hours. All CCTV materials provided from AXIS Company ( Swedish security company).

Supply and installation of communications towers to connect the system between Central Bank of Libya and the 20 commercial banks in Benghazi and its suburbs.

Supply,    installation    and    commissioning    of    PTMP    Broad    band    wireless communications system at one of AGOCO (Arabian Gulf Oil Company) camps in NAFORA Oil Well Field.

Supply,    installation    and    commissioning    of    PTMP    Broad    band    wireless communications system at WAHDA Bank in Benghazi to link five Branching Banks.